Honolulu Harbor Maintenance Dredging

Bow Engineering & Development, Inc. was contracted to perform water quality monitoring for the Honolulu Harbor Maintenance Dredging project to address the requirements set by the U.S. Army Corps of Engineers and the approved water quality monitoring plan. Coordination with the contractor and U.S. Army…

Continue reading →

Sand Island WWTP Outfall

Bow Engineering was contracted by Healy Tibbitts to provide water quality monitoring and reporting for the Sand Island Wastewater Treatment Plant Ocean Outfall Shoreline Revetment project. Monitoring is performed to ensure the environment in the immediate and surrounding areas were not impacted negatively by construction….

Continue reading →

Kahauiki Stream Maintenance Dredging

Bow Engineering was contracted to perform water quality monitoring before, during, and after dredging. Inspection reports are submitted to the contractor and owner for review and comment prior to submittal. Summary reports are prepared before and after all dredging activities are complete. Sediment sampling and…

Continue reading →

Kapalama Terminal Wharf Dredging, Phase II

Kiewit Infrastructure West, Co. contracted Bow Engineering to provide water quality monitoring and reporting services for the Kapalama Wharf project.  The scope of our work was limited to preconstruction, during construction, and post-construction monitoring and reporting. Section 401 water quality certification compliance, including consultations and…

Continue reading →

Waikiki Beach Maintenance

Due to sand erosion along Waikiki Beach, sand replenishment was necessary to restore the beach to its approximate 1985 shoreline. Sand for replenishment was pumped from sand deposits about 450 – 500 meters offshore, dewatered on the beach to dry, then transported along the shore…

Continue reading →

Waikaea Boat Ramp Dredging

Waikaea boat ramp is a two-phase project requiring design coordination in order to tie each phase together in regards to drainage grading. Phase 1 consists of harbor maintenance dredging to remove sand buildup near the boat launching ramp and upstream portions of the canal. The…

Continue reading →

Kainalu Seawall Repairs

Bow Engineering provided Project Management and construction BMP design for the Kainalu Apartment’s seawall, which was experiencing severe cracking and foundation failure.  We obtained various permits including: Section 401 WQC Application, Section 404 Permit, DLNR OCCL Permit, and an NPDES Dewatering Permit, Form G.  During…

Continue reading →

Manele Small Boat Harbor Master Plan

Funded by the Federal Transit Administration, this project was to significantly improve the Manele Small Boat Harbor in support of economic growth, enhance commuter ferry operations between the islands of Lanai and Maui, improve the existing ferry facilities, and provide long-term infrastructure for a more…

Continue reading →

Kauai Lagoons Dam Safety

This project consisted of analyses and design of dam safety improvements for the 395-acre-foot water feature located at the Kauai Lagoons Resort.  The water feature was classified by the state Department of Land and Natural Resources (DLNR) as a dam with high hazard potential.  Analyses…

Continue reading →

Manele Boat Harbor Tsunami Damage

Bow Engineering was contracted by the state Department of Land and Natural Resources to repair the damages caused by the March 10, 2011, tsunami to the Manele Small Boat Harbor in accordance with FEMA Declaration No. 1967 DR Hi.  We were responsible for conducting site investigation…