Kaimuki High School Gym Parking Lot

Bow Engineering provided the civil design for a new 104-stall asphalt concrete parking lot for the Kaimuki High School gymnasium.  The new parking lot included a designated bus drop-off area, five ADA parking stalls, a graveled drainage swale, and a new concrete walkway to the…

Continue reading →

UH Manoa Walkways Master Plan

Bow Engineering was contracted by the University of Hawaiʻi to evaluate the existing walkway conditions throughout the Mānoa campus.  This involved creating an inventory of existing walkways, identifying and evaluating deficiencies and hazards, prioritizing recommended restorations and improvements, recommending construction of additional walkways, and verifying…

Continue reading →

Lyon Arboretum Trail Improvements

This project involved the design and construction of paved trails throughout the Harold L. Lyon Arboretum. Several routes were redesigned and are currently being rebuilt in compliance with the Accessibility Guide for Outdoor developed areas.  In addition to the repaving, safety signs were also installed,…

Continue reading →

Heeia Elementary Parking Lot

Heeia Elementary Parking Lot

Heeia Elementary School Parking Lot & Drainage Improvements The scope of this project consisted of a repaving and restriping of 61 existing parking stalls and a parking lot expansion of 21 new stalls.   The existing non-compliant ADA stalls were modified to conform with the current…

Continue reading →

UH at Manoa Krauss Hall Drainage

University of Hawaii at Manoa Krauss Hall Drainage Improvements The scope of this project was to determine the cause of flooding to Krauss Hall and to suggest remedial drainage improvements for the University of Hawaii’s Manoa campus.  It was determined that the existing drainage systems…

Continue reading →

Saint Louis Grotto Beautification

This beautification project includes site grading and drainage improvements for a new grotto platform at Saint Louis School.  The platform is surfaced with synthetic turf and is bordered by moss rock walls for grade adjustment and to provide a seating area for the students.  Also…

Continue reading →

UH Track: Discuss/Javelin Relocation

The scope of this project included disassembling the existing discus, javelin and hammer throw cage in Cooke Field, and relocating them to a new location within the Manoa campus designated by University of Hawaii.  Installation of wooden barricades along the edges of the existing shotput…

Continue reading →

DOE Underground Injection Control

DOE Underground Injection Control Monitoring and Reporting Bow Engineering is contracted for the monitoring and reporting of 181 seepage pits operated by 39 schools under the Department of Education on all islands.  The monitoring includes assisting school personnel to perform weekly visual inspections, performing monthly…

Continue reading →

Kamehameha School Gym Parking Lot

Bow Engineering provided the plans and specifications for the AC resurfacing of the existing 1.0 acre gym parking lot.  Also included in the project was the re-construction of the existing driveway entrance. The project utilized a cold-planing technique to reuse the existing base course, thus…

Continue reading →