Hokuala Resort Master Planning

In December 2014, Tower Kauai Lagoons, LLC purchased the existing Kauai Lagoons Resort from the Marriott Vacation Club International and rebranded the site to “Hokuala.” When fully developed, Hokuala will include 772 resort residential units and various commercial facilities (restaurants, retail centers, etc.). Bow Engineering…

Continue reading →

Kalanipu’u at Kauai Lagoons

Kalanipu‘u at Kauai Lagoons is consisted of two multi-story condominium buildings and one multi-story timeshare building. Bow Engineering provided civil engineering services for the 78 condominium units and a 126-stall parking lot on the resort grounds.  We furnished the design for roadway, site and grading,…

Continue reading →

Kauai Lagoons Irrigation Master Plan

Bow Engineering performed site investigation, research and irrigation system analysis.  The irrigation master plan analyzed the existing and proposed Kauai Lagoons irrigation system in regards to demand, source, storage and infrastructure.  The proposed projects would require up to two-million gallons of irrigation water per day. …

Continue reading →

Kauai Lagoons Golf Course

Design of 11 golf-course holes encompassing 107 acres.  The civil design included grading and drainage improvements consisting of over 430,000 cubic yards of earthwork and 23,000 lineal feet of drain line.  In addition, the design incorporated the Jack Nicklaus design parameters, and construction phasing to…

Continue reading →

Kauai Marriott Resort Renovations

Civil design and construction administration for three elements of the $50 million renovation project at the Kauai Marriott Resort on Kauai.  Work involved civil design for grading, drainage, ADA access and utility service to a new restroom and towel facility for the resort’s pool area,…

Continue reading →

Ritz Carlton Due Diligence

Bow Engineering & Development, Inc. produced a civil due diligence report and subsequent drainage report and construction drawings for the Ritz Carlton Kapalua Bay Residences.  Deficiencies in civil design were identified by field investigation and analysis of as-built plans for the property.  Recommendations to address…

Continue reading →

Waikiki Marriott Lower Plaza

  This design-build project allowed pedestrian access from the Kalakaua Street sidewalk to the restaurant outdoor seating area and the newly created entrance, by replacing the 3-foot high retaining walls with sloped landscaping and stairways. Bow Engineering provided civil engineering services for design, planning and…

Continue reading →

Marriott Vacation Club Timeshares

Marriott Vacation Club is a development of seven timeshare condominium towers consisting of 282 living units and 355 parking stalls at Kauai Lagoons. Bow Engineering provided civil design for roadway, site and grading plans, water, sewer and drainage systems.  We worked closely with the project…

Continue reading →

Kauai Lagoons Dam Safety

This project consisted of analyses and design of dam safety improvements for the 395-acre-foot water feature located at the Kauai Lagoons Resort.  The water feature was classified by the state Department of Land and Natural Resources (DLNR) as a dam with high hazard potential.  Analyses…

Continue reading →