404, Not Found Try again

Hawaii Parks ADA Improvements

This project addresses improvements to ensure ADA accessibility compliance for Milolii Beach Park and Kahuku Park. Improvements to Milolii Beach Park include the reconstruction of the Pavilion, Comfort Station and Water Tank, Basketball Court, Parking Lot, and ADA accessible walkways. Improvements to Kahuku Park include…

Continue reading →

Alii Kai Park

The Department of Parks and Recreation asked for Bow’s help in constructing a new 1.6 acre community park. The park features a comfort station, playground, pavilion, parking lot, and ADA accessible walkways. We supplied the site and utility layout, grading, drainage analysis, specifications, and permitting….

Continue reading →

North Shore Gateway

North Shore Gateway is a new two-story commercial building in Haleiwa, with several office and retail spaces, including a Starbucks.  The project included a new asphalt concrete parking lot, ADA walkway, lighting system, and permanent underground drainage chambers.  Bow Engineering provided the site, utility, and grading…

Continue reading →

Princeville Center Expansion

Bow Engineering provided civil engineering services for grading, water, sewer and drainage.  The addition of five buildings and over 230 parking spaces resulted in a large increase in storm water runoff.  In an effort to maximize the buildable area of the lot, we designed a…

Continue reading →

Mililani Mauka Gateway North

This project started with a due diligence study to determine the feasibility of adding three buildings to an existing shopping center with approximately 60,000 square feet of retail space.  The study also determined the adequacy of the site’s existing water, fire protection, sewer, drainage, parking…

Continue reading →

Kahala Mall Starbucks

This project involved converting an existing asphalt concrete parking area to a commercial coffee shop and drive-thru. Civil engineering design work included preparing plans for demolition, erosion control, and the site layout, grading of the building foundation, patio and drive-thru, and calculating earthwork quantities.  

Continue reading →

Takahashi Building

The two-story Takahashi Building offers 5,900 sq.ft. of office and retail space with 16 parking stalls.  Bow Engineering provided civil engineering design for the site improvements, which included grading and drainage, parking lot layout, ADA parking stall and route, and water and sewer connections.

Continue reading →

Mililani Mauka Gateway South

Gateway South is a two-phase project that involves the repaving and re-stripping of the existing parking lot and constructing an office building on-site. The first phase involves the construction of a new 13,000 square foot building in the east portion of the lot, displacing a…

Continue reading →