404, Not Found Try again

Kawainui Marsh Levee Flood Hazard Environmental Abatement

Bow Engineering & Development, Inc. was contracted by DLNR to provide professional services for planning, design, and permitting for stabilization improvements of the Kawainui Flood Control Levee. Improvements provide the DLNR Division of Forestry and Wildlife with access for Levee maintenance to comply with dam…

Continue reading →

Keaau Middle School Parking Lot Improvements

Bow Engineering & Development, Inc. was contracted by the Department of Education to address settling issues within the school’s parking lot. Settling appeared to be a combination of heavy bus loads and a nearby fire hydrant leak, which caused the pavement to sink. The scope…

Continue reading →

Waimea Elementary School Parking Lot Improvements

Bow Engineering & Development, Inc. was contracted to design a new parking lot to optimize the space available and replace the existing temporary parking area. New parking lot work included erosion control, grading, ADA compliant walkways, ADA parking stalls, student drop off area, drainage improvements,…

Continue reading →

Kealaula at Pua Loke Transitional Housing

Kealaula at Pua Loke is long term rental housing project consisting of twenty-nine (29) dwelling units, offices, storage, and a laundry room throughout 16 buildings. This project was created for families transitioning from homelessness and was realized through support from State Ohana Zone funds and…

Continue reading →

Honolulu Harbor Maintenance Dredging

Bow Engineering & Development, Inc. was contracted to perform water quality monitoring for the Honolulu Harbor Maintenance Dredging project to address the requirements set by the U.S. Army Corps of Engineers and the approved water quality monitoring plan. Coordination with the contractor and U.S. Army…

Continue reading →

Honu’Apo Estuary Wetland Restoration, Phase I

Bow Engineering & Development, Inc. was contracted by the Department of Land and Natural Resources to provide professional services for the Honu’Apo Estuary Wetland Restoration project, Phase I. Included in our scope was a preliminary engineering report, site investigation and research, a concept design, cultural…

Continue reading →

Sand Island WWTP Outfall

Bow Engineering was contracted by Healy Tibbitts to provide water quality monitoring and reporting for the Sand Island Wastewater Treatment Plant Ocean Outfall Shoreline Revetment project. Monitoring is performed to ensure the environment in the immediate and surrounding areas were not impacted negatively by construction….

Continue reading →

Kahauiki Stream Maintenance Dredging

Bow Engineering was contracted to perform water quality monitoring before, during, and after dredging. Inspection reports are submitted to the contractor and owner for review and comment prior to submittal. Summary reports are prepared before and after all dredging activities are complete. Sediment sampling and…

Continue reading →

Kauai Economic Opportunity (KEO) Sewer Connection

The KEO facility’s sewer is currently served by six (6) Individual Wastewater Systems which were abandoned or removed to facilitate the installation of a new gravity sewer network. Bow Engineering was contracted to provide civil engineering research and design for the connection of existing sewer…

Continue reading →

Kamokala Road Structural Repairs and AC Overlay

Existing Kamokala Road provides access to the Military’s ordnance storage facilities. The road originally was constructed in the 1940’s and was deteriorated in many locations with cracking and settlement. Project scope was to repaved and reconstructed 6,055 linear feet of 12-foot wide road. Concrete swales…

Continue reading →

Page 1 of 7 1 2 3 4 5 ... Last →