Bow Engineering provided the civil design for 2,200 linear feet of off-site waterline, site and grading plans for a 150,000-gallon “glass fused to steel” water tank, fire and domestic water pump house, site and grading plans for wastewater treatment plant and access road, force main, 4,000 linear feet of on-site roadway along with water, sewer, drain lines, realignment of existing irrigation ditch and culvert crossing for roadway. Our scope of work also included permitting for the fire protection system, grading, NPDES and Section 401/404 Water Quality permits for work on the existing irrigation ditch.
Recent Comments