Bow Engineering & Development, Inc. was contracted by Peter Vincent Architects to perform the civil work for a new 7,500 square foot residence in the Diamond Head neighborhood. The property is graded with two-tiers; a tennis court located on the bottom tier, and a two-story residence and swimming pool on the top tier.
Bow Engineering provided the construction plans and details, including earthwork, coordination with the client and government agencies, and construction administration services. We were responsible for the infrastructure design, which includes the driveway, water, sewer, and drainage systems, and prepared the erosion control and drainage reports.
Recent Comments