Bow Engineering provided civil engineering services for grading, water, sewer and drainage. The addition of five buildings and over 230 parking spaces resulted in a large increase in storm water runoff. In an effort to maximize the buildable area of the lot, we designed a combination of surface and below-ground detention systems to maintain pre-development flows to the offsite. Our scope of work also included NPDES permit and offsite improvements to add left-turn acceleration and deceleration lanes to the two Kuhio Highway entrance.
Recent Comments