Kaimuki High School Gym Parking Lot

Bow Engineering provided the civil design for a new 104-stall asphalt concrete parking lot for the Kaimuki High School gymnasium.  The new parking lot included a designated bus drop-off area, five ADA parking stalls, a graveled drainage swale, and a new concrete walkway to the…

Continue reading →

Hokuala Resort Master Planning

In December 2014, Tower Kauai Lagoons, LLC purchased the existing Kauai Lagoons Resort from the Marriott Vacation Club International and rebranded the site to “Hokuala.” When fully developed, Hokuala will include 772 resort residential units and various commercial facilities (restaurants, retail centers, etc.). Bow Engineering…

Continue reading →

Koae Affordable Housing

Bow Engineering provided the civil design of a 134-unit affordable housing complex in Poipu, Kauai.  The affordable housing complex incorporated the “Complete Streets” concept and included  23 buildings, a community center, new roadways, parking, ADA, and drainage improvements. This project was prompted by the Kauai County…

Continue reading →

UH Manoa Walkways Master Plan

Bow Engineering was contracted by the University of Hawaiʻi to evaluate the existing walkway conditions throughout the Mānoa campus.  This involved creating an inventory of existing walkways, identifying and evaluating deficiencies and hazards, prioritizing recommended restorations and improvements, recommending construction of additional walkways, and verifying…

Continue reading →

Kalanipu’u at Kauai Lagoons

Kalanipu‘u at Kauai Lagoons is consisted of two multi-story condominium buildings and one multi-story timeshare building. Bow Engineering provided civil engineering services for the 78 condominium units and a 126-stall parking lot on the resort grounds.  We furnished the design for roadway, site and grading,…

Continue reading →

Nawiliwili Road Improvements

This design-build project involved the reconstruction of 2,200 lineal feet of 4-lane highway from Kukui Grove to Kanani Street, spanning 3 intersections.  The new Portland Cement Concrete roadway section included new sidewalks and curb ramps, curb and gutters, bike lanes, drainage systems, and new traffic…

Continue reading →

Princeville Center Expansion

Bow Engineering provided civil engineering services for grading, water, sewer and drainage.  The addition of five buildings and over 230 parking spaces resulted in a large increase in storm water runoff.  In an effort to maximize the buildable area of the lot, we designed a…

Continue reading →

Lyon Arboretum Trail Improvements

This project involved the design and construction of paved trails throughout the Harold L. Lyon Arboretum. Several routes were redesigned and are currently being rebuilt in compliance with the Accessibility Guide for Outdoor developed areas.  In addition to the repaving, safety signs were also installed,…

Continue reading →

Waipouli Courtyards Affordable Housing

Courtyards at Waipouli is a design-build project of 80 affordable housing units in a cluster of multi-story buildings.  Bow Engineering provided civil engineering services for the infrastructure design of roadway, water, sewer and drainage systems to support the project.  We also provided the design for off-site…

Continue reading →

Ward Ave. Water System Improvements

This project replaced 2,500 lineal feet of 8-inch and 12-inch water mains along Ward Avenue between Kinau and King Streets and between King Street and Kapiolani Boulevard.  In addition to the water mains, other interconnections, fire hydrants, service laterals and meter boxes were replaced to…

Continue reading →