404, Not Found Try again

Pouhala Marsh Restoration – EA & ESA

The goal of the Pouhala Marsh State Wildlife Sanctuary Restoration was to rehabilitate a 10 acre are to create a pond for increased native bird habitat. Bow Engineering worked with DOFAW to create a concept design and Final EA (HRS 343) to be used for…

Continue reading →

Kapalama Terminal Wharf Dredging, Phase II

Kiewit Infrastructure West, Co. contracted Bow Engineering to provide water quality monitoring and reporting services for the Kapalama Wharf project.  The scope of our work was limited to preconstruction, during construction, and post-construction monitoring and reporting. Section 401 water quality certification compliance, including consultations and…

Continue reading →

Waikiki Beach Maintenance

Due to sand erosion along Waikiki Beach, sand replenishment was necessary to restore the beach to its approximate 1985 shoreline. Sand for replenishment was pumped from sand deposits about 450 – 500 meters offshore, dewatered on the beach to dry, then transported along the shore…

Continue reading →

Pua Loke Affordable Housing

Pua Loke is an affordable housing complex consisting of 54 units on approximately 1.47 acres in Lihue, Kauai, Hawai’i. For this project Bow provided civil design for an offsite sewer system near the proposed Pua Loke Affordable Housing development. The proposed water system includes approximately…

Continue reading →

Hawaii Parks ADA Improvements

This project addresses improvements to ensure ADA accessibility compliance for Milolii Beach Park and Kahuku Park. Improvements to Milolii Beach Park include the reconstruction of the Pavilion, Comfort Station and Water Tank, Basketball Court, Parking Lot, and ADA accessible walkways. Improvements to Kahuku Park include…

Continue reading →

Alii Kai Park

The Department of Parks and Recreation asked for Bow’s help in constructing a new 1.6 acre community park. The park features a comfort station, playground, pavilion, parking lot, and ADA accessible walkways. We supplied the site and utility layout, grading, drainage analysis, specifications, and permitting….

Continue reading →

Waimea Affordable Housing

Waimea Affordable is a joint-venture affordable housing project involving 36 multi-family units (Ahe Group) and 32 single-family homes (Habitat for Humanity). The project site was leveled out and designed to have a combined drainage system with a shared roadway. Bow Engineering assisted by providing civil…

Continue reading →

Waikaea Boat Ramp Dredging

Waikaea boat ramp is a two-phase project requiring design coordination in order to tie each phase together in regards to drainage grading. Phase 1 consists of harbor maintenance dredging to remove sand buildup near the boat launching ramp and upstream portions of the canal. The…

Continue reading →

Kainalu Seawall Repairs

Bow Engineering provided Project Management and construction BMP design for the Kainalu Apartment’s seawall, which was experiencing severe cracking and foundation failure.  We obtained various permits including: Section 401 WQC Application, Section 404 Permit, DLNR OCCL Permit, and an NPDES Dewatering Permit, Form G.  During…

Continue reading →

North Shore Gateway

North Shore Gateway is a new two-story commercial building in Haleiwa, with several office and retail spaces, including a Starbucks.  The project included a new asphalt concrete parking lot, ADA walkway, lighting system, and permanent underground drainage chambers.  Bow Engineering provided the site, utility, and grading…

Continue reading →

Page 2 of 7 1 2 3 4 5 ... Last →