Bow Engineering & Development, Inc. was contracted by the Department of Education to address settling issues within the school’s parking lot. Settling appeared to be a combination of heavy bus loads and a nearby fire hydrant leak, which caused the pavement to sink. The scope of the project looked to reconstruct and resurface the parking lot with new striping.
Recent Comments