Bow Engineering provided the plans and specifications for the AC resurfacing of the existing 1.0 acre gym parking lot. Also included in the project was the re-construction of the existing driveway entrance. The project utilized a cold-planing technique to reuse the existing base course, thus reducing the overall construction cost. The drainage conditions were studied and certain areas were re-graded to promote positive drainage.