Bow Engineering provided the civil design for a new 104-stall asphalt concrete parking lot for the Kaimuki High School gymnasium. The new parking lot included a designated bus drop-off area, five ADA parking stalls, a graveled drainage swale, and a new concrete walkway to the cafeteria. Bow Engineering provided the site, utility, and grading plan for the new parking lot and designed drainage improvements to prevent onsite flooding. A graveled swale and drywell system were designed to meet storm water quality requirements.
Recent Comments