Bow Engineering was contracted to perform water quality monitoring before, during, and after dredging. Inspection reports are submitted to the contractor and owner for review and comment prior to submittal. Summary reports are prepared before and after all dredging activities are complete. Sediment sampling and analysis were also performed for the contractor to determine the best disposal location for the dredge material.
Recent Comments