Providing 27 Years of Professional Engineering Services in Hawaii
Your go to Team for Civil Design & ESCP Services
-
Residential: Courtyards at Waipouli
A design-build project of 80 affordable housing units. Bow Engineering provided civil engineering services for the infrastructure design of roadway, water, sewer, and drainage systems, as well as off-site improvements.
-
Resort: Kalanipu'u at Kauai Lagoons
Bow Engineering provided civil engineering services for the 78 condominium units and a 126-stall parking lot. Design included roadway, site and grading plans, as well as water, sewer, and drainage systems.
-
Utility: Ward Avenue 12-Inch and 8-Inch Water Mains
Replaced 2,500 linear feet of 8-inch and 12-inch water mains along Ward Avenue. Bow Engineering provided connection schematics, plan/profile drawings, traffic control plans, and NPDES permits for de-watering, hydrotesting, and storm runoff.
-
Educational: UH Manoa Campus Walkways Restoration & Improvement Master Plan
An inventory of existing walkway conditions were evaluated, identifying deficiencies and hazards, prioritizing recommended improvements, and verifying conformance to the 2010 American Disabilities Act (ADA) standards.
-
Roadways & Parking: Street Resurfacing in Leeward-Central District
Bow Engineering was responsible for the design and permitting for the resurfacing of 17 miles of existing streets in Leeward-Central Oahu, covering areas in Waianae, Mililani, Waipahu, and Pearl City.
-
Commercial: Gateway North Shopping Center at Mililani Mauka
The project started with a due diligence study to determine feasibility of adding three buildings to the existing shopping center. Once the owner decided to acquire the property, Bow Engineering designed the site improvements and prepared construction drawings and permits. We also prepared an Industrial Wastewater Permit for the grease interceptor.
-
Recreational: Kauai Lagoons Golf Course
Bow Engineering designed 11 golf-course holes (out of 27) encompassing 107 acres. The design incorporated the Jack Nicklaus design parameters and included grading and drainage improvements consisting of 430,000 cubic yards of earthwork and 23,000 lineal feet of drain line.
-
Agricultural: Monsanto Kunia Agricultural Seed Processing & Drying Facility
This 20 acre seed facility involved the construction of several large buildings, a package wastewater treatment plant, a 300-stall parking lot, potable and non-potable water distribution, and an on-site storm runoff detention and retention system.
-
Harbors & Waterfront: Manele Small Boat Harbor Tsunami Damage Response
Contracted by State DLNR to repair damages caused by the March 2011 tsunami. Temporary measures put into place to resume ferry service while loading docks, piers, and rock groins were repaired. 2014 ASCE Special Project of the Year.
Copyright 2024 Bow Engineering & Development, Inc. All Rights Reserved
Recent Comments